Sample property
House under construction, Port Harcourt, Nigeria
This is a sample- Owner
- Dallas, United States (made up)
- Plot
- 50 × 100 ft plot (about 15 × 30 m)
- Visits
- 4 so far
- Latest result
- Checks passed
What the owner was told, against the visit
An automated comparison of the claim with what this visit shows. Not a professional opinion; NEMZION never advises on payments.
“Roofing has started. The roof timbers are up.”
Contractor · WhatsApp message, Sep 29
None of this visit's 7 views of the walls and the roof line show roof timbers or sheets, so this visit doesn't show roofing having started.
- Roof line from the back and the front (EV-06, EV-08): wall tops open, nothing fixed on top
- Reference views of all 4 sides (EV-01, EV-04, EV-05, EV-07): walls at lintel level; no roof timbers or sheets
- Roof timbers, trusses or sheets on any side
House under construction, Port Harcourt, Nigeria
- Likely inside
- Inside
- GPS accuracy
- Beacon found
EV-01Front: walls at lintel level. No roof timbers or sheets.
- Captured
- 10:16 am WAT
- Received
- 10:16 am WAT
- Location
- Likely inside5 m inside the boundary · GPS ±5 m
- LocationPassed
- 2 inside, 6 likely inside
- TimingPassed
- All captured during the visit; 2 captures taken without signal and received later
- CoveragePassed
- Every side in view (estimated)
- IntegrityPassed
- No inconsistency detected
- Visit continuityPassed
- With interruptions: 2 captures taken without signal, received later
Every capture in the visit
Each with its own time, location result and place on the plot. Where the sample has no photo, the capture's position and direction stand in, and say so.
EV-01Front: walls at lintel level. No roof timbers or sheets.
- Captured
- 10:16 am WAT
- Received
- 10:16 am WAT
6-second clip, turning from the front towards the right side: walls at lintel level, no roof timbers or sheets.
Demonstration video (6 s): how this clip appears in the NEMZION record, standing in for the sample's site footage. Captions describe the screen.
- Captured
- 10:16 am WAT
- Received
- 10:17 am WAT
The gate and the road in front. The spot by the gate is clear.
- Captured
- 10:18 am WAT
- Received
- 10:18 am WAT
EV-04Left side: walls at lintel level. No roof timbers or sheets.
- Captured
- 10:20 am WAT
- Received
- 10:20 am WAT
Back: walls at lintel level. No roof timbers or sheets.
- Captured
- 10:22 am WAT · no signal
- Received
- 10:25 am WAT
Roof line from the back: wall tops open, nothing fixed on top. No roof timbers or sheets.
- Captured
- 10:24 am WAT · no signal
- Received
- 10:25 am WAT
EV-07Right side: walls at lintel level. No roof timbers or sheets.
- Captured
- 10:26 am WAT
- Received
- 10:26 am WAT
Roof line from the front: wall tops open, nothing fixed on top. No roof timbers or sheets.
- Captured
- 10:28 am WAT
- Received
- 10:28 am WAT
The property's history
- Oct 1, 2026 · 10:29NZ-WFDH-9G4E-JNL9Walls at lintel level · roofing claim not supported8 captures; all 4 reference views, compared with Sep 17. 12 bags of cement stacked by the gate on Sep 17: not visible today.Checks passed
- Oct 1, 2026 · 3:05NZ-WFDH-9G4E-JNL9Request from the owner“The contractor says roofing has started. Please show me the roof.” Guided visit.Request
- Sep 17, 2026 · 3:31NZ-G8EQ-TT9J-VGGYSubstructure / DPC9 captures; all 4 reference views. 12 bags of cement stacked by the gate.Checks passed
- Aug 20, 2026 · 11:02NZ-9LVJ-34LZ-PTWJFoundation9 captures; the first reference views of each side.Checks passed
- Aug 6, 2026 · 9:40NZ-WJL7-LUPY-SD43Boundary walk4 photos, one at each corner of the survey-plan boundary.Checks passed
Progress, visit by visit
Each visit's photos are compared with the last. The record notes the construction milestone reached: Substructure / DPC at the previous visit, Blockwork to lintel now. This is an automated estimate from the photos, never a percentage. A Progress Film plays each visit's reference views in order. It never changes once it's made.
Read this visit as a full sample record- Aug 6, 2026Boundary walkBefore building
- Aug 20, 2026FoundationFoundation
- Sep 17, 2026Substructure / DPCSubstructure / DPC
- Oct 1, 2026Walls at lintel levelBlockwork to lintel
What the person on site sees
They open the invitation, read what a visit records, allow the camera and location, then follow one instruction at a time. There's no checklist to learn, and the app takes each photo live, with no gallery option.
- ✕Need help?Walk toward the propertyWalk toward it
The map shows where the property is. Walk toward it: there's no spot to find and no dot to line up.
- ✕Need help?You're near the propertyNear the property
The phone works out when it's at the property. They tap Start visit, and NEMZION compares the phone's location with the property.
- ✕Need help?Point at the propertyPrevious viewPoint the camera
Point the camera at the property. On a repeat visit, a small picture shows the view taken last time.
- ✕Need help?Good view: take the photoTake the photo
When the view is good, the corners turn green. Tap the button to take the photo, then check it before it's used.
- ✕Need help?No signal: carry on, everything sends later✓ CapturedCaptured
The next view follows the same way, until the phone says the visit is complete. With no signal, it sends later.
- Legal title or ownership of land or a building
- Survey-grade location or boundaries (phone location can be off by several meters)
- That a structure is safe, sound or built to code
- Compliance with planning, building or other regulations
- That a contractor or anyone else is honest, or that work was paid for or authorized
- That a payment should be made or was authorized
- That manipulation is impossible: NEMZION's checks make it hard and say when something doesn't add up, but no system can rule it out entirely
Start your own record
Add your property, invite the person who'll visit, and see your first record. Your real data never mixes with these samples.
Sample property. Names, places and photos are made up to show how NEMZION works.


